fbpx

progress photos

Countryside Progress #2 768 1024 Kelly Slates
Countryside Exterior Progress Photo

Countryside Progress #2

Check out the building progress photos from our newest tiny house model, the Countryside! This phase included beginning the installation of the composite roofing, and framing of the windows and doors. ¬†Stay tuned to see what’s next!

 

Countryside Building Progress Photos - Exterior with Composite Roofing Added

Exterior Progress Photo with Composite Roofing Added

 

Countryside Interior Progress Photo

Interior Progress Photo

Shonsie Progress #4 1024 681 Kelly Slates

Shonsie Progress #4

How about a double dose of Shonsie? The Shonsie will now be available in two different color options. What color do you like best?DSC_0046 (3)
Shonsie Progress #3 1024 681 Kelly Slates

Shonsie Progress #3

The next step for the Shonsie is to create a mounting system for the metal roof. Any idea what color roof we have in mind?
Degsy Progress #8 1024 681 Kelly Slates

Degsy Progress #8

Take a peek into the Degsy kitchen. This gourmet kitchen features a built-in cutting board, and electric cooktop and a smooth surface countertop!
Shonsie Progress #2 681 1024 Kelly Slates

Shonsie Progress #2

The Shonsie’s interior layout is similar to our Roving model. However, the Shonsie features lighter interior tones, exposed rafters, a glass sliding door and an enclosed porch area.

Degsy Progress #7 736 489 Kelly Slates

Degsy Progress #7

Our Degsy model features large amounts of natural light thanks to the oversized Ply Gem windows throughout the space.

Shonsie Progress #1 571 859 Kelly Slates

Shonsie Progress #1

Welcome to the Shonsie! Follow along with us as we post pictures of the building process. We can’t wait to reveal the final product to you!

Degsy Progress #6 489 736 Kelly Slates

Degsy Progress #6

We are wrapped and ready to go! Now that the exterior wall sheathing has been secured, we have added housewrap for the underlayment of the siding….. In addition to the wrap, ice and water shield is placed for a layer of protection before the roof is installed. We make sure to take these necessary steps to ensure your tiny house is protected from all weather elements!

Degsy Progress #5 736 736 Kelly Slates

Degsy Progress #5

Framing is going up by our team in the 84 Lumber Custom Millwork Shop!

Degsy Progress #4 736 736 Kelly Slates

Degsy Progress #4

Now that we have the floor insulated, we add OSB sheathing to the floor and we are ready for framing. The Degsy model is actually built over the wheel wells which gives you more usable space inside!

  • 1
  • 2